Education Infrastructure Projects

Education Technology Initiatives

Pace Digitek Limited has contributed to multiple education technology initiatives across India by supplying digital learning infrastructure including laptops, interactive whiteboards and smart classroom systems to government institutions.

Successfully Completed
India · Education Initiatives
10000
Laptop Units (AP)
2000
Laptop Units (MP)
100
Interactive Whiteboards
2
Education Projects
AP & MP
Deployment Regions
Project Overview

Digital Learning Enablement Across India

Pace Digitek executes education infrastructure projects that equip institutions with laptops, smart classroom hardware and support systems for technology-enabled learning.

These initiatives span laptop supply for government colleges and deployment of interactive classroom solutions that support modern teaching methods and student engagement.

Together, the projects contribute to building a more inclusive, digitally ready education ecosystem for students and educators.

View Full Scope
Key Project Details
ProjectsEducation Technology Initiatives
SegmentEducation Infrastructure
Laptops (AP)10,000 Units
Laptops (MP)2,000 Units
Interactive Boards100 Units
InstitutionsAP & MP Government Institutions
SolutionLaptops & Smart Classroom Systems
RegionsAP & MP
Status✓ Completed
Scope of Work

What We Delivered

SITC of Telecom 45 meter towers

Supply, installation, testing and commissioning of 100 new 45-meter telecom towers across pan-India locations.

SITC of power infrastructure equipment

Complete supply, installation, testing and commissioning of power systems, rectifiers, and energy management infrastructure for all sites.

SITC of Active IBS eNode B (B-40 / B-28)

Installation and commissioning of 100 active Indoor Base Station eNodeB units supporting Band-40 and Band-28 frequencies.

SITC of OFC 24 Core SM fiber

Supply, installation, testing and commissioning of 200 km of 24-Core Single Mode Optical Fiber Cable for backhaul connectivity.

Supply of retractable mast of 15 meter pole

Supply of retractable mast poles of 15-meter height for flexible telecom infrastructure deployment at designated sites.

SITC of 2 meter pole mount for antennas

Supply, installation, testing and commissioning of 2-meter pole mounts for proper antenna positioning at all tower sites.

Removal of 3G devices with reverse logistics

Systematic decommissioning and reverse logistics management for removal of existing 3G equipment from upgrade sites.

Tower maintenance & strengthening of 4G & 5G sites

Structural maintenance and strengthening of existing tower infrastructure to support current 4G and future 5G network deployments.

Technical Specifications
Equipment & Technology Details

Key technology parameters deployed across all 200 sites under the ITI–AFCEL 4G initiative.

Tower Height45 Meters
IBS TechnologyeNode B
Frequency BandsB-40 / B-28
Fiber TypeOFC 24 Core SM
Fiber Length200 km
Mast Height15 Meters (Retractable)
Antenna Mount2 Meter Pole Mount
Future Ready4G & 5G Ready
4G Coverage Expansion

Significantly contributed toward expanding 4G connectivity across multiple telecom locations pan-India, improving mobile network quality and coverage.

5G-Ready Infrastructure

Tower maintenance and structural strengthening ensures sites are future-ready, capable of supporting next-generation 5G network deployments.

Indoor Coverage via IBS

100 IBS eNodeB sites improve indoor mobile coverage, addressing signal quality inside buildings and high-density areas across India.

Delivery Highlights

Project Achievements at a Glance

100+
45-Meter Tower Sites
New telecom towers deployed across pan-India locations
100
IBS eNodeB Sites
Indoor Base Stations with B-40 / B-28 frequency support
200km
OFC Fiber Laid
24-Core Single Mode fiber for high-speed backhaul connectivity
200
Total Sites Completed
All telecom sites successfully delivered across India
Project Successfully Completed

All deliverables met — tower sites, IBS infrastructure and fiber connectivity deployed across pan-India locations.

100
Towers Deployed
100
IBS Sites Done
200 km
Fiber Laid
200
Sites Completed
Project Status

Project Successfully Completed

All Deliverables Completed

The ITI – AFCEL 4G Project has been successfully completed, delivering telecom tower deployment, IBS infrastructure and fiber connectivity to support enhanced mobile network coverage across multiple locations in India.

Project Mobilization & Survey
Site surveys completed and teams deployed across all pan-India locations.
Tower Supply & Civil Works
100 new 45-meter telecom towers supplied, installed and commissioned across India.
Power Systems & IBS Installation
100 IBS eNodeB (B-40/B-28) systems and all power infrastructure installed and tested.
OFC Fiber Deployment
200 km of 24-Core SM OFC fiber laid and commissioned for backhaul connectivity.
3G Removal & Tower Strengthening
Legacy 3G devices removed with reverse logistics; tower strengthening for 4G/5G readiness completed.
Get Involved

Interested in Partnering with Us?

Reach out to our team to discuss telecom infrastructure projects, BESS solutions, or any collaboration opportunities across India and globally.