Telecom Infrastructure Project

ITI – AFCEL 4G Project

Pace Digitek Limited participated in the ITI–AFCEL 4G deployment initiative aimed at strengthening telecom infrastructure across India through installation of telecom towers, IBS systems and optical fiber connectivity.

Successfully Completed
Pan India · ITI–AFCEL
100
New 45 Meter Tower Sites
100
IBS Sites
200 kms
Fiber Laying
200
Total Telecom Sites
Pan India
Deployment Region
Project Overview

4G Infrastructure Expansion Across India

The ITI–AFCEL 4G Project was implemented to expand telecom infrastructure across India through the deployment of new telecom towers, IBS systems and fiber connectivity.

Under this project, Pace Digitek was responsible for supply, installation, testing and commissioning of telecom towers, power infrastructure equipment and network components. The project also included optical fiber deployment and strengthening of telecom infrastructure to enhance network coverage.

The initiative contributed significantly towards expanding 4G connectivity across multiple telecom locations across India.

View Full Scope
Key Project Details
ProjectITI – AFCEL 4G
SegmentTelecom ICT
New Tower Sites100 (45 Meter)
IBS Sites100
Fiber Laid200 km (OFC 24 Core SM)
Total Telecom Sites200
Technology4G / IBS (B-40 / B-28)
RegionPan India
Status✓ Completed
Scope of Work

What We Delivered

SITC of Telecom 45 meter towers

Supply, installation, testing and commissioning of 100 new 45-meter telecom towers across pan-India locations.

SITC of power infrastructure equipment

Complete supply, installation, testing and commissioning of power systems, rectifiers, and energy management infrastructure for all sites.

SITC of Active IBS eNode B (B-40 / B-28)

Installation and commissioning of 100 active Indoor Base Station eNodeB units supporting Band-40 and Band-28 frequencies.

SITC of OFC 24 Core SM fiber

Supply, installation, testing and commissioning of 200 km of 24-Core Single Mode Optical Fiber Cable for backhaul connectivity.

Supply of retractable mast of 15 meter pole

Supply of retractable mast poles of 15-meter height for flexible telecom infrastructure deployment at designated sites.

SITC of 2 meter pole mount for antennas

Supply, installation, testing and commissioning of 2-meter pole mounts for proper antenna positioning at all tower sites.

Removal of 3G devices with reverse logistics

Systematic decommissioning and reverse logistics management for removal of existing 3G equipment from upgrade sites.

Tower maintenance & strengthening of 4G & 5G sites

Structural maintenance and strengthening of existing tower infrastructure to support current 4G and future 5G network deployments.

Technical Specifications
Equipment & Technology Details

Key technology parameters deployed across all 200 sites under the ITI–AFCEL 4G initiative.

Tower Height45 Meters
IBS TechnologyeNode B
Frequency BandsB-40 / B-28
Fiber TypeOFC 24 Core SM
Fiber Length200 km
Mast Height15 Meters (Retractable)
Antenna Mount2 Meter Pole Mount
Future Ready4G & 5G Ready
4G Coverage Expansion

Significantly contributed toward expanding 4G connectivity across multiple telecom locations pan-India, improving mobile network quality and coverage.

5G-Ready Infrastructure

Tower maintenance and structural strengthening ensures sites are future-ready, capable of supporting next-generation 5G network deployments.

Indoor Coverage via IBS

100 IBS eNodeB sites improve indoor mobile coverage, addressing signal quality inside buildings and high-density areas across India.

Delivery Highlights

Project Achievements at a Glance

100+
45-Meter Tower Sites
New telecom towers deployed across pan-India locations
100
IBS eNodeB Sites
Indoor Base Stations with B-40 / B-28 frequency support
200km
OFC Fiber Laid
24-Core Single Mode fiber for high-speed backhaul connectivity
200
Total Sites Completed
All telecom sites successfully delivered across India
Project Successfully Completed

All deliverables met — tower sites, IBS infrastructure and fiber connectivity deployed across pan-India locations.

100
Towers Deployed
100
IBS Sites Done
200 km
Fiber Laid
200
Sites Completed
Project Status

Project Successfully Completed

All Deliverables Completed

The ITI – AFCEL 4G Project has been successfully completed, delivering telecom tower deployment, IBS infrastructure and fiber connectivity to support enhanced mobile network coverage across multiple locations in India.

Project Mobilization & Survey
Site surveys completed and teams deployed across all pan-India locations.
Tower Supply & Civil Works
100 new 45-meter telecom towers supplied, installed and commissioned across India.
Power Systems & IBS Installation
100 IBS eNodeB (B-40/B-28) systems and all power infrastructure installed and tested.
OFC Fiber Deployment
200 km of 24-Core SM OFC fiber laid and commissioned for backhaul connectivity.
3G Removal & Tower Strengthening
Legacy 3G devices removed with reverse logistics; tower strengthening for 4G/5G readiness completed.