Project Award Highlight
Solar-plus-Storage Infrastructure

116 MW (AC) Solar PV + 241 MWh BESS – BSPGCL

BESS DC Block supplier for hybrid project

Pace Digitek Limited has been selected by BSPGCL as the BESS DC Block supplier for the 116 MW (AC) Solar PV Power Plant integrated with a 241 MWh Battery Energy Storage System at Kajra, Bihar.

116 MW AC Solar
241 MWh BESS
Solar-plus-Storage
BESS DC Blocks
Key Project Details
116 MW (AC) Solar + 241 MWh BESS
Hybrid · DC Block Supply · Bihar
116 MW (AC)
Solar Capacity
241 MWh
Battery Storage Capacity
Solar + BESS
Project Type
BSPGCL
Client (Bihar)
DC Block Supplier
Pace Digitek Role
Kajra, Bihar
Location

This project marks a significant milestone in Pace Digitek’s growing portfolio as a trusted technology and equipment partner for large-scale solar-plus-storage projects implemented by state utilities.

Solar PV + BESS Hybrid
DC Block Technology Supply
State Utility Partnership
Kajra, Bihar
Project Overview

Enabling solar-plus-storage for BSPGCL

This project is part of BSPGCL’s initiative to deploy integrated renewable energy and storage infrastructure to enhance grid stability, improve renewable energy utilization, and enable peak power support.

As part of this hybrid configuration, Pace Digitek is supplying critical DC-side battery blocks, forming the core energy storage backbone of the project.

Strategic role in a hybrid configuration

By delivering the BESS DC Block package, Pace Digitek provides the key storage hardware that enables the solar plant to operate as a more dispatchable, grid-supporting asset for BSPGCL.

Scope & Impact

Supplying the energy storage backbone

Scope of Work

Design & engineering of DC battery block architecture
Manufacturing and supply of battery modules & racks
Factory testing, inspection, and Q/A
Packaging, transportation, and delivery to site
Technical support for integration with PCS & EMS

Why This Project Matters

Hybrid project participation – Contribution to a large-scale solar-plus-storage project.
State utility trust – Engagement with BSPGCL as a technology supplier.
Storage specialization – Demonstrates expertise in BESS DC-side systems.
Grid-scale relevance – Supports dispatchable renewable energy deployment.

The DC Block package is engineered to integrate seamlessly with plant PCS and EMS, helping BSPGCL unlock the full value of solar-plus-storage at Kajra.

Role in Bihar’s power system

By enabling stored solar energy to be dispatched during peak demand and critical grid conditions, the project supports a more reliable, flexible, and cleaner power system for Bihar.

Peak Power Support
Renewable Utilisation
Grid Stability
Hybrid Infrastructure
Our Commitment

Delivering high-quality BESS DC systems

Execution & quality assurance

Pace Digitek Limited is committed to delivering high-quality, standards-compliant BESS DC equipment, robust safety and quality assurance practices, timely delivery aligned with project schedules, and long-term technical support for system integration.

Vision

PaceDigitek—driving innovation in energy storage and power solutions for a sustainable, connected world.

Contact

Planning a solar-plus-storage or DC block project?

Connect with Pace Digitek to explore BESS DC block supply, solar-plus-storage configurations, and hybrid project solutions for utilities and developers.