Project Award Highlight
Solar-plus-Storage Development

Solar PV Power Project with Energy Storage System (ESS) – SECI

100 MW ISTS-connected PV + ESS · BOO

Pace Digitek Limited has been selected as a Solar Power Developer (SPD) by SECI for a 100 MW ISTS-connected Solar PV Power Project integrated with an Energy Storage System (ESS).

100 MW Solar
PV + ESS Hybrid
ISTS-XV Program
BOO Model
Key Project Details
100 MW PV + ESS – ISTS
SPD · BOO · National Grid
100 MW
Solar Capacity
PV + ESS
Project Type
SECI
Client
BOO
Build, Own & Operate
ISTS
Grid Connectivity
2025
Award Year

This award reflects SECI’s confidence in Pace Digitek’s capability to deliver storage-backed, dispatchable renewable energy projects at the national level.

ISTS-XV Solar + ESS
Solar Power Developer (SPD)
BOO Implementation
Storage-Backed Solar
Project Overview

National-level ISTS solar-plus-storage development

This award reflects SECI’s confidence in Pace Digitek’s capability to deliver storage-backed, dispatchable renewable energy projects at the national level.

The project, under SECI’s ISTS-XV program, aims to deploy large-scale solar power projects with mandatory energy storage to improve grid flexibility, reliability, and renewable energy integration.

SPD under BOO framework

As a Solar Power Developer on a Build–Own–Operate basis, Pace Digitek will develop, own, and operate the hybrid PV + ESS asset while supplying contracted energy into the ISTS network.

Scope & Milestone

End-to-end delivery of ISTS-connected PV + ESS

Scope of Work

Identification and acquisition of suitable land
Detailed engineering, design, and technology selection
Development and installation of solar PV generation facilities
Deployment and integration of the Energy Storage System (ESS)
Testing, commissioning, and synchronization with the ISTS grid

Why This Project Is a Major Milestone

ISTS-level project – Participation in a national inter-state solar-plus-storage program.
Developer recognition – Selection as an SPD by SECI.
Storage integration – Enables firm and reliable renewable power delivery.

By combining utility-scale solar with integrated storage, the project will deliver more predictable, dispatchable clean power to the ISTS network.

Role in India’s renewable trajectory

The project supports India’s push towards higher renewable penetration by providing flexible, storage-backed solar energy that can be aligned with system demand and grid requirements.

Dispatchable Solar
Grid Flexibility
ISTS Integration
Long-Term PPA
Our Commitment

Delivering compliant, reliable hybrid power

Execution & regulatory alignment

Pace Digitek Limited is committed to delivering this project with strong project development and execution capabilities, full compliance with SECI, MNRE, CERC, and CEA regulations, and reliable long-term power supply performance over the PPA tenure.

Vision

PaceDigitek—driving innovation in energy storage and power solutions for a sustainable, connected world.

Contact

Planning an ISTS or utility-scale PV + ESS project?

Connect with Pace Digitek to explore hybrid solar-plus-storage development models for SECI, state utilities, and private offtakers.